A Project With Unique Characteristics

Two Rivers, Two Powerhouses

 

Akhalkalaki HPP-1

  • Headworks with lateral intake

  • 3.31 km of GRP pipe

  • 7.5 MW surface powerhouse

  • 39,2 GWh annual generation

Akhalkalaki HPP-2

  • Tyrolean type intake

  • 1.95 km of GRP and Steel pipe

  • 1.6 MW surface powerhouse

  • 9,8 GWh annual generation

Connection to the Grid

  • A mutual 35kV overhead transmission line will connect the Akhalkalaki HPP to the national grid of Georgia through Diliska and Akhalkalaki substations