A Project With Unique Characteristics
Two Rivers, Two Powerhouses
Akhalkalaki HPP-1
Headworks with lateral intake
3.31 km of GRP pipe
7.5 MW surface powerhouse
39,2 GWh annual generation
Akhalkalaki HPP-2
Tyrolean type intake
1.95 km of GRP and Steel pipe
1.6 MW surface powerhouse
9,8 GWh annual generation
Connection to the Grid
A mutual 35kV overhead transmission line will connect the Akhalkalaki HPP to the national grid of Georgia through Diliska and Akhalkalaki substations